The Metropolitan Electricity Authority (MEA) deployed teams to Nonthaburi to repair electrical equipment and the distribution system damaged by a recent thunderstorm and strong winds.
This swift action ensures the restoration of a stable power supply for residents and emphasizes public safety during severe weather conditions.
Fast Facts
Source
MEA mobilizes staff to quickly resolve power outages in Nonthaburi, restoring grid stability and warning residents about strong winds.